SEC Filings

10-K
AVEXIS, INC. filed this Form 10-K on 02/28/2018
Entire Document
 

volunteered for a gene therapy clinical trial that utilized an adenovirus vector at University of Pennsylvania School of Medicine. Researchers at the university had infused the volunteer’s liver with a gene aimed at reversing OTC deficiency. The procedure triggered an extreme immune‑system reaction that caused multiple organ failure in a very short time, leading to the first death to occur as a direct result of a gene therapy experiment. In addition, in two gene therapy studies in 2003, 20 subjects treated for X‑linked severe combined immunodeficiency using a murine gamma‑retroviral vector showed correction of the disease. However, the studies were suspended by FDA after a child in France developed leukemia and ultimately four other subjects were found to have developed leukemia.

In addition, our success will depend upon physicians who specialize in the treatment of SMA and prescribing treatments that involve the use of AVXS‑101 in lieu of, or in addition to, other treatments with which they are more familiar and for which greater clinical data may be available. More restrictive government regulations or negative public opinion would have an adverse effect on our business, financial condition, results of operations and prospects and may delay or impair the development and commercialization of AVXS‑101 or demand for any product candidate we may develop. Serious adverse events in our clinical trials, or other clinical trials involving gene therapy products or our competitors’ products, even if not ultimately attributable to the relevant product candidates, and the resulting publicity, could result in increased government regulation, unfavorable public perception, potential regulatory delays in the testing or approval of AVXS‑101, stricter labeling requirements for AVXS‑101 that are approved and a decrease in demand for AVXS‑101.

Failure to comply with ongoing regulatory requirements could cause us to suspend production or put in place costly or time‑consuming remedial measures.

The regulatory authorities may, at any time following approval of a product for sale, initiate an inspection of the manufacturing facilities for such product. If any such inspection or audit identifies a failure to comply with applicable regulations, or if a violation of product specifications or applicable regulations occurs independent of such an inspection or audit, the relevant regulatory authority may require remedial measures that may be costly or time‑consuming to implement and that may include the temporary or permanent suspension of a clinical trial or commercial sales or the temporary or permanent closure of a manufacturing facility. Any such remedial measures imposed upon our third‑party manufacturer or us could materially harm our business, financial condition, results of operations and prospects.

If we or our third‑party manufacturer fails to comply with applicable cGMP regulations, the FDA and foreign regulatory authorities can impose regulatory sanctions including, among other things, refusal to approve a pending application for a new product candidate or suspension or revocation of a pre‑existing approval. Such an occurrence may cause our business, financial condition, results of operations and prospects to be materially harmed.

Additionally, if supply from a manufacturing facility is interrupted, there could be a significant disruption in commercial supply of AVXS‑101. Although we are evaluating potential third parties and additional internal sources of redundant manufacturing capacity, we do not currently have a backup manufacturer for AVXS‑101 supply for clinical trials, and have not selected a manufacturer or backup manufacturer for AVXS‑101 supply for commercial sale. An alternative manufacturer would need to be qualified, through a supplement to its regulatory filing, which could result in further delay. The regulatory authorities also may require additional trials if a new manufacturer is relied upon for commercial production. Switching manufacturers may involve substantial costs and could result in a delay in our desired clinical and commercial timelines.

Any contamination in our manufacturing process, shortages of raw materials or failure of any of our key suppliers to deliver necessary components could result in delays in our clinical development or marketing schedules.

Given the nature of biologics manufacturing, there is a risk of contamination. Any contamination could materially adversely affect our ability to produce AVXS‑101 on schedule and could, therefore, harm our results of operations and cause reputational damage.

Some of the raw materials required in our manufacturing process are derived from biologic sources. Such raw materials are difficult to procure and may be subject to contamination or recall. A material shortage, contamination, recall or restriction on the use of biologically derived substances in the manufacture of AVXS‑101 could adversely

64


 


© AveXis, Inc. All Rights Reserved.